Honda of the UK Manufacturing (HUM) has a medium sized High Pressure Die Casting facility at its Swindon plant. Capacity utilization was over 90% in 2002 when the “Engineering Theme” was set up to challenge the facility’s productivity and profitability. The aim was to create spare capacity in existing equipment and to fill it by producing castings which were being outsourced. Consequently this led to finding and solving problems, which were both conventional and innovative in terms of management control and technical complexity. The lessons learned have brought the company closer to realizing its ‘power of dreams’, successfully creating a near ideal business cell. The experience has been shared worldwide and set new benchmarks for future planning within the global organization.
Full paper (PDF)
PDF · 218.08 KB · Document in English
The full paper is available to members of the institute only.
Log in to downloadDetails
AuthorsMuneer AHMED
OrganisationHONDA of the UK manufacturing Ltd., Swindon, UK
Event67th World Foundry Congress
TopicEngineering
Document languageEnglish
Year2006